VGA.RUN Beta
EN

VALHEIM 1.0

Deep North

Data as of 1.0.7 · 09.09.2026

Building plan

Put items in with »Into the plan«: the tree shows what to gather and build for them, from the meadows down to the goal.

The result

The bill

Every raw material, intermediate steps resolved. Stations are not counted — you build those once.

Key

Goal Needed Station Extension The path: a product becomes an ingredient, a station a building site Ingredient and product Circle colour: region of the source
Black Marble Pile

Source Mistlands

Stats

ID blackmarble_pile

Crafting

Crafted without a workbench.

Total cost 50 Black Marble

Take out of the plan

Black Marble

Source Mistlands

Other biomes Ashlands

Dropped by Dvergr Rogue

Main source Rock · Giant remains, Giant skeleton Giant skeletons

Stats

Stack 50

Weight 2

ID BlackMarble