VGA.RUN Beta
EN

VALHEIM 1.0

Deep North

Data as of 1.0.7 · 09.09.2026

Building plan

Put items in with »Into the plan«: the tree shows what to gather and build for them, from the meadows down to the goal.

Workbench

The result

The bill

Every raw material, intermediate steps resolved. Stations are not counted — you build those once.

Key

Goal Needed Station Extension The path: a product becomes an ingredient, a station a building site Ingredient and product Circle colour: region of the source
Smelter

Source Black Forest

Stats

ID smelter

Crafting

Requires Workbench at level 1.

Total cost 20 Stone 5 Surtling Core

Take out of the plan

Wood

Source Meadows

Other biomes Black Forest, Swamp, Mountain, Plains, Mistlands, Ashlands, Deep North

Main source Birch, Ground, Beech, Oak

Sites Charred tower ruins

Stats

Stack 50

Weight 2

ID Wood

Stone

Source Meadows

Other biomes Black Forest, Swamp, Mountain, Plains, Mistlands, Ashlands, Deep North

Main source Ground, Boulder

Sites Charred Fortress

Stats

Stack 50

Weight 2

ID Stone

Surtling Core

Source Black Forest

Other biomes Swamp, Plains, Mistlands, Ashlands

Dropped by Surtling

Main source Burial Chambers, Chest

Sites Fuling village, Dvergr harbour, Dvergr lighthouse, Dvergr guard tower, Infested Citadel, Infested Mine

Stats

Stack 10

Weight 5

ID SurtlingCore